Skip to Content (Press Enter)
L.B. Foster Logo. Rail and infrastructure solutions.

Transition Bonded Insulated Joints

a pile of transition bonded rail.

L.B. Foster provides transition rails that will meet project requirements.

Transition rails can be used to connect rails of the same section, but with different head wear by milling the head of the transition rail to match that of the existing track.

Our in-house milling capabilities allow for quicker turnaround and better-quality control.

close-up of a rail bar.

Contact Us
  • L.B. Foster North America
  • Pittsburgh, PA
Office Hours:
Monday - Friday: 09:00-17:00 ET

Ordering and More Information

Contact a local representative today.

🇨🇦 Canada

🇺🇸 United States

🇧🇷 Brazil

Featured Rail News

The official source for news, thoughts, and announcements from L.B. Foster.

.

L.B. Foster Champions Inclusion at RIA Trailblazers Summer Networking Reception

Last week, L.B. Foster proudly returned as a supporting sponsor of the Railway Industry Association (RIA) Annual Trailblazers Summer...
.

L.B. Foster: Keeping You Cool at Rail Live 2026

We are pleased to confirm our return to Rail Live 2026, the UK’s largest outdoor rail exhibition. This year, we will showcase a...
.

Watch: Introducing the L.B. Foster 320' Rail Consist

L.B. Foster is redefining rail delivery with the successful development and first-ever delivery of 320-foot rail to Lake State Railway in...