Skip to Content (Press Enter)
L.B. Foster Logo. Rail and infrastructure solutions.

Transition Bonded Insulated Joints

a pile of transition bonded rail.

L.B. Foster provides transition rails that will meet project requirements.

Transition rails can be used to connect rails of the same section, but with different head wear by milling the head of the transition rail to match that of the existing track.

Our in-house milling capabilities allow for quicker turnaround and better-quality control.

close-up of a rail bar.

Contact Us
  • L.B. Foster North America
  • Pittsburgh, PA
Office Hours:
Monday - Friday: 09:00-17:00 ET

Ordering and More Information

Contact a local representative today.

🇨🇦 Canada

🇺🇸 United States

🇧🇷 Brazil

Featured Rail News

The official source for news, thoughts, and announcements from L.B. Foster.

.

Stay Ahead of Spring Thaw: L.B. Foster's Real-Time Rockfall Monitoring for Safer, Smoother Operations - Progressive Railroading DemoCast

Will Becker, Product Manager - Obstacle Detection, presented our Rockfall Monitoring solution during a DemoCast held by Progressive...
.

L.B. Foster's WILD IV Case Study: Qualifying the Benefits of Wheel Impact Load Detection

Forces at the wheel-rail interface are a key consideration for railway networks. For decades, railroads have utilized L.B. Foster's WILD...
.

Interface Journal Features a Presentation by Marco Santoro, Manager of Global FM Applications

Interface Journal recently published an article titled, “On-Board Top of Rail Friction Modifier Application: A More Efficient Approach?”...