L.B. Foster Logo.
Welcome to Our Updated Website!

You've been redirected to our new website to provide you with a better and more enhanced browsing experience. Thank you for your continued support.

CXT Logo.
Welcome to the new L.B. Foster Company global website, which now includes all of the CXT's precast concrete products.

You've been redirected to our new website to provide you with a better and more enhanced browsing experience. Use the search feature to quickly find the products you are looking for and thank you for your continued support.

CXT Logo.
Welcome to the new L.B. Foster Company global website, which now includes all of the CXT's precast concrete products.

You've been redirected to our new website to provide you with a better and more enhanced browsing experience. Use the search feature to quickly find the products you are looking for and thank you for your continued support

CXT Logo.
Welcome to the new L.B. Foster Company global website, which now includes all CXT and VanHooseCo precast products. L.B. Foster Company’s wholly owned subsidiary, CXT Incorporated, acquired VanHooseCo Precast LLC.

You've been redirected to our new website to provide you with a better and more enhanced browsing experience. Use the search feature to quickly find the products you are looking for and thank you for your continued support.

Press Release
Skip to Content (Press Enter)
L.B. Foster Logo. Rail and infrastructure solutions.

Bonded Insulated Joint Assemblies

Allegheny Rail Products provides factory assembled high performance bonded insulated rail joints from its ISO registered facilities in Pueblo, CO and Niles, OH.

.

Insulated rail joints serve as the central nervous system of railroad lines, preventing electrical current from flowing between the ends of two adjoining rails.

When a train passes over a joint, the train's wheels complete the electrical circuit -- enabling rail operators to know the precise location of trains within complex railways, and triggering crossing signals when a train approaches a road crossing.

In the manufacturing process, L.B. Foster team members receive 80-foot pieces of steel rail, cut them in half and create electrical discontinuity by placing an insulating material (Kevlar®) between the two halves. Then they strengthen the joint by adding a support bar and bind all the components in place with an epoxy.

Factory Assembled:

  • Epoxy bonded with high integrity TEMPRANGE® II epoxy for long life

  • Full-contact, micro alloy joint bar

  • Assembled to specified length, up to 60' long

  • Available in worn rail/transition rail configurations

  • Assembled with A-490 bolts or huck pins (6 or 8)

  • Ultra long life ENDURA-JOINT® with Aramid insulation also available

KEVLAR® is a registered trademark of E. I. du Pont de Nemours and Company or its affiliates.

illustration of a bonded insulated joint.

Product illustration shows features of our bonded insulated joint assemblies.

Contact Us
  • L.B. Foster North America
  • Pittsburgh, PA
Office Hours:
Monday - Friday: 09:00-17:00 ET

Ordering and More Information

Contact a local representative today.

🇨🇦 Canada

🇺🇸 United States

🇧🇷 Brazil

Featured Rail News

The official source for news, thoughts, and announcements from L.B. Foster.

.

Drone Footage Highlights Rockfall Monitoring Technology in the Field

L.B. Foster captured aerial footage of an active Rockfall Monitoring installation, providing a unique perspective on how advanced...
.

A New Standard in Railroad Rockfall Protection - A progressive Railroading DemoCast

On September 8, 2026, Will Becker, Product Manager - Obstacle Detection Systems, presented L.B. Foster’s Advanced Rockfall Monitoring...
.

Wheel Impact Load Detector (WILD) Overview & Passenger System Case Study- A Progressive Railroading DemoCast

On August 25, 2026, Jacob Capra, Product Manager - WILD, presented L.B. Foster's WILD IV solution during a Progressive Railroading DemoCast.